• IMS Implemented
  • SAP Integrated
  • ATEX Certified

Synchronization Panels

Customized 440V Generator Synchronization Control Panels

Marketing, Design & Proposal (Experienced & Seasoned Team):

Our experienced and seasoned team of marketing, design, and proposal engineers play a crucial role in understanding customer requirements and fulfilling them through technical and commercial documents. We openly discuss all options with the customer and design a cost-effective system in accordance with IEC standards and good engineering practices.

Mechanical Fabrication (Ensuring Absolute Accuracy):

We utilize advanced and automated laser cutting machinery for our fabrication works, significantly improving the final appearance of the cubicle. By eliminating manual cutting flaws and inaccuracies, we enhance the overall aesthetics.

Enclosure/Structure (Offering Extra Durability & Longevity):

Our enclosures are constructed using 14-gauge MS Sheets treated with high-quality chemicals, acids, and zinc phosphate. They are then powder coated to provide enhanced mechanical strength and attractive aesthetics for your Substation. To ensure quality control and assurance, we meticulously check the microns at every coating stage with the help of our qualified engineers and testing equipment.

Equipment/Components (Using Genuine Breakers, Wiring & Busbars):

We carefully select licensed and authorized distributors for procuring breakers, wiring, busbars, and other components to be installed in our LV Switchgear. Each component undergoes rigorous testing by our qualified engineers and testing equipment to ensure quality control and assurance.

Testing (Site Acceptance Test & Factory Acceptance Test):

We extend an invitation to our customers to join us and observe the final stage of their product’s completion, the Factory Acceptance Test (FAT).

In the Factory Acceptance Test (FAT), our qualified engineers and testing equipment ensure customer satisfaction by conducting sequential tests on the product.

Additionally, we offer Site Acceptance Test (SAT) services where we take responsibility for integrating our product into the customer’s existing facility on-site. The SAT is conducted by our installation team during the commissioning and handover stage. All parameters that were previously confirmed during FAT are re-verified in the presence of the customer to ensure a smooth transition and the product’s suitability for long-term usage.

Warranty & Claims:

We provide our customers with a standard one-year back-to-back warranty covering all equipment and the performance of the panel. While our products are manufactured to perfection, we understand that external circumstances may affect individual components. Our dedicated aftersales team is committed to expediting and addressing any customer claims promptly and diligently.